The installation of the Green Machine is the first of its kind to connect the machine at the beginning of the heat loop, providing the Green Machine with higher waste heat temperatures to increase power output, while maintaining proper heat input to the anaerobic digesters.
URL: http://green-energy-news.com/nwslnks/clips213/feb13020.html
No comments:
Post a Comment